The Challenge:
A multinational 3PL operating out of ATL required a high-density storage and picking solution for B2B health and wellness products. Facing stringent SLA requirements and the high cost of manual picking labor, the client needed a system that could maximize vertical space without requiring disruptive facility modifications, while hitting a tight go-live window.
The 3PL-TOTAL Integration:
Rather than proposing a one-size-fits-all hardware rollout, 3PL-TOTAL assessed the workflow and designed a 1,500-tote AirCube™ implementation tailored to the specific SKU mix and facility constraints.
Verified Outcomes:
- Commissioning Leadtime: System brought from floor-to-flow in exactly 5 weeks, minimizing operational disruption.
- Workflow Capability: 100% Goods-to-Person delivery implemented, removing zero-productive actions (walking, searching) from the picking cycle.
- Space Economics: Successfully leveraged the 6.5m clearance with a raised setup design, drastically improving storage density over traditional racking.